Acrow - Les Etats-Unis Acrow Canada - en Anglais ACROW USA Web site Acrow - en français ACROW Corporation of America - Return to Home Page
Acrow Technical Data
About Acrow
Vehicular Bridges
Beam Bridges
Heavy-Haul Bridges
Callender-Hamilton Bridges
Railroad Bridges
Moveable Bridges
Pedestrian Bridges
Shoring and Superprops
Military Bridges
Ro-Ro Ramps
Engineering Consulting
Acrow NewsYou are here.
Testimonials
Press Room
 
   
   
     
Acrow News:
   

News Release:
Acrow Responds to Metro NY/NJ Rail Bridge Emergency with Superprop® System.

NEWS RELEASE
August 01, 2001

For the second time within a 30 day period Acrow Corporation was asked to respond to a bridge emergency requirement in the metro NY/NJ area. This particular case was a through girder railroad bridge, which apparently weakened over years of usage, and required immediate Acrow Superprop - NY/NJ Rail reinforcement following an inspection.

The consulting engineering firm managing the large project described the problem on the phone to an Acrow engineer. Acrow’s engineers were then able to design a shoring solution, overnight, using the Acrow Superprop system. Acrow Superprop equipment was delivered to the job site within 12 hours and the entire shoring system was erected within a day. The rail bridge required 23 Superprops located strategically in accordance with the engineering design. The design loading is the heaviest railroad loading in the USA and it is called AREMA Cooper E-80.

Acrow Superprop One Acrow Superprop has the capability to support 250 tons unbraced to heights of 40 feet. The Acrow Superprop is one of the most versatile, compact (20 inch diameter) and easy to install shoring systems in the construction industry. It is completely modular, and it pins and bolts together. The head of the Superprop extends 1.4 feet using standard hydraulic jacks. After the Superprop has been extended, simply turn the collar nut until it seats and remove the hydraulic jacks.

Acrow Superprop and Bridge products are rented or sold depending on the customer’s need.

   
| Vehicular Bridges | Beam BridgesHeavy-Haul Bridges | Callender-Hamilton Bridges | Railroad Bridges | Moveable Bridges |
|
Pedestrian Bridges | Shoring and Superprops
®  | Military Bridges | Marine Ramps | Engineering Consulting | email ACROW |
| Home | About ACROW | Acrow News | Testimonials | Press RoomContact Us |

ACROW Limited

Ontario Office:

70 King St. East, Bolton, Ontario,  L7E 3G2   Phone:  1-866-72ACROW (22769)  Fax:1-905-857-1334

British Columbia Office: Suite #130, 10691 Shellbridge Way, Richmond. B.C., V6X2W8  Phone: 604-276-0550 Fax: 604-270-3644
Quebec Office: Phone 514-907-4366
E-Mail: Info@AcrowCanada.com
© 2002-2006 ACROW Limited. All rights reserved,
Visit GNTS online GREAT NORTHERN TECHNICAL SERVICES
Hosts and Provides Management of this web site
.
407651 Visitors to our site since January 01 2003